21 June 2010

SIDAREC continues to grow


 View of Early Childhood Development/Large Gathering Hall from front courtyard.

 Interior View of Early Childhood Development/Large Gathering Hall.

View of Early Childhood Development/Large Gathering Hall from rear of site.

 
View of Internet Training Center and toilet block.

 
View along shaded veranda.



 
North perimeter security wall nearing completion.

11 June 2010

SIDAREC's Wall Construction Continues


View of existing bakery with ECD in background.

Construction progress with cyber cafe behind.

View along veranda between cyber cafe and ECD.

View of cyber cafe along service alley.

View of toilet block and internet training center along service alley.

View of early childhood development (ECD) with the slum of Mukuru beyond.

View of internet training center.

View of internet training center and toilet block.

04 June 2010

SIDAREC Going Vertical


View looking east toward early childhood development (ECD) and large meeting hall.

View looking southeast toward early childhood development (ECD) with cyber cafe in background.

View looking south toward internet training center and toilet block. Veranda columns in the foreground.

Internet trainging center walls under construction. Cyber cafe beyond and ECD on left.

Internet cafe "holo-in-the-wall" computer kiosks under construction.

Toilets under construction.

View looking west down serivce alley access.

New north security perimeter wall under construction.



27 May 2010

SIDAREC oh, slab.


 
Conduit and plumbing rough-in placed in newly poured floor slab. View towards ICT and toilet block from back of site.

 View towards ICT and toilet block looking toward back of site.

 
 Plumbing rough-in for restrooms.

 
 Conrete slab being poured for early childhood development and large meeting room.

 
 Slab reinforcement being placed with electrical conduit rough-in at internet cafe. View from near site entry.

Vapor barrier and reinforcement steel in place and ready for concrete slab pour. 
 
 

24 May 2010

SIDAREC has hardcore


Hardcore (i.e. structural fill) in place. Looking from rear of site toward street.


Hardcore in place at Early Childhood Development/Large Meeting wing.
Beginning the placement of the hardcore.

Site wall nearing completion.

Site wall nearing completion.

Foundation wall repair in progress.

Backfill nearing completion.

Backfill nearing completion. Looking toward rear of site from site entry.

11 May 2010

SIDAREC Getting Ever Closer to Rising from the Ground


Backfilling for Computer Lab, Toilet block and covered walkway underway.

View from site entrance with structural fill nearing completion.

Early Childhood Development area backfilled with structural fill.

Columns and perimeter site wall getting a final finish.

03 May 2010

Roots & Wings Technology Learning Center Breaks Ground

Roots & Wings International broke ground on their new computer technology learning center in Pasac, Guatemala in mid-April. Congratulations RWI!

Clearing the site.

Clearing the site.

Clearing the site.

Site excavation in progress.

Site excavation in progress.

Site excavation in progress.

Site excavation in progress.

Site excavation in progress.

Layout of building foundation.

Layout of building foundation.

Rendering of technology center by The Global Studio

Rendering of technology center by The Global Studio